Movable Sound Proof Partitions , Office Fire Resistant Acoustic Wall Panel
Product Details:
Place of Origin: | Guangdong |
Brand Name: | BANGE |
Certification: | ISO9001 |
Model Number: | 85 mm sound proof partitions |
Payment & Shipping Terms:
Minimum Order Quantity: | 10 square meters |
---|---|
Price: | US Dollars 80 - 120 per square meters |
Packaging Details: | Carton package, MDF batten on four section sides , foam board on both front face. |
Delivery Time: | 15-20 days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 50000 square meters per month |
Detail Information |
|||
Panel Width: | 500 Mm--1230 Mm | Door Material: | Melamine Board |
---|---|---|---|
Surface: | Melamine,leather,fabric,plywood | Position: | Interior |
Open Style: | Sliding | Product Name: | Sound Proof Partitions |
Feature: | Sound Proofing | Size: | 85 Mm(3 1/4 Inch) |
Color: | Accept Customized | Application: | Office,hotel,banquet Hall |
Highlight: | sounproof folding partition,movable soundproof partition |
Product Description
Office Fire Resistant Acoustic Wall Panel Movable Sound Proof Partition
Sound proof partition features
1. Floorless suspension: There is no track on the floor, just install the track on the ceiling;
2. Stable and safe: It is stable and reliable after being cut off, and it is not easy to swing;
3. Compartments environmental protection: the compartment effect is good, the maximum sound insulation coefficient up to 50db;
4. Insulation and energy conservation: excellent insulation performance, according to different seating rates, the hall is divided into small spaces to reduce air conditioning power consumption;
5. High-efficiency fire prevention: The production of high-efficiency fireproof materials, and good fireproof performance;
6. Beautiful and generous: any surface decoration, can be combined with the indoor decoration effect;
7. Retractable and flexible: The partitions move freely, promoting flexibility, and one person can complete the entire process of partitioning;
8. Convenient collection: when closing, the partition can be hidden in a dedicated storage cabinet, which does not affect the overall appearance;
9. Wide range of applications: Products are used in hotels, hotels, restaurants, conference halls, exhibition halls, high-cleaning factories and offices.
Sound proof partition advantage:
1.Flexible:
Movable Walls are easily changed to meet requirements of changing environments, whether they are fixed, thus they cannot be relocated.
2.Time Saving
In Movable Walls’ installation the time from start to finish is considerably faster. By contrast, in installation the loss of time is enormous due to taping, muddling, sanding, painting.
3.Relocatable
The changes in Movable Wall Systems are extremely easy, while panels are relocated with no mess or carpet repair. Depending on layout, 75% to 100% of the product is reused. However, changes require demolition and disposal of product at a landfill. Carpeted areas need replacing and completely new products are being ordered.
4.Easier in Construction
In Movable Walls there is the need of only one trade for the install. This results in better project management. On the contrary, to install we follow several trades - steel stud, drywall install, taping and muddling, painting, trims – baseboard, door frame and door install.
Panel Suspension
|
Top hunge system without the need for a floor track.
|
||
Panel Width
|
Each panel 600mm-1200mm.
|
||
Track
|
Aluminum OR Steel Track
|
||
Roller on panel
|
Single or Double Roller
|
||
Panel Frames
|
Heavy-duty steel-gusseted aluminum inner frames reinforced with full height.
|
||
Top&bottm seals
|
Top and bottom pressure retractable seals ensure effortless moved and locked.
|
||
Module
|
700mm - 1200mm maximum.
|
||
Panel stacking
|
Numerous panel stacking options for complete flexibility.
|
||
Panel surface
|
MDF,Plywood, woven fabric, Leather,Natural wood veneer, Melamine.
|
||
Finishes
|
Satin anodised or polyester powder coating to all exposed aluminium components available in a wide range of colours as standard.
|
Installing details:
1. Before the installation of the activity partition, it is necessary to inspect the track where the track parts are assembled on the floor in sequence;
2.Mark the track line and placement bracket in a specific location;
3.Installation activity partition rail brackets facing the ceiling;
4.Check whether the active partition is firmly fixed on the track, when the track and bracket must be loosely stored in the storage area so that the bracket plate can be moved to other places;
5.Measure the proper position of the storage track before the installation of the main track. This is very important for the placement of the intersections, so that the installation of the active partition below can continue;
