• Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended
  • Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended
  • Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended
  • Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended
Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended

Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended

Product Details:

Place of Origin: China
Brand Name: BUNGE
Certification: ISO9001
Model Number: 85 mm movable partition walls

Payment & Shipping Terms:

Minimum Order Quantity: 10 square meters
Price: US Dollars $ 78 / 128 per square meter
Packaging Details: Carton package, MDF batten on four section sides ,foam board on both front face.
Delivery Time: 10-25 days
Payment Terms: D/A, L/C, D/P, Western Union, MoneyGram, T/T
Supply Ability: 5000 square meters per month
Get Best Price Contact Now

Detail Information

Color: Accept Customized Thickness: 85 Mm(3 1/4 Inch)
Style: Sliding Height: 2-17 Meters
Product Name: Movable Partition Walls Width: 800-1200 Mm
High Light:

movable walls on wheels

,

movable partitions systems

Product Description

Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended

 

Details of Movable Partition Walls

 

1. Movable partition wall is exclusively used as the facade of the separation in the interior space, its' application is more flexible, it usually produce the blocking effect, generally don't do it under the board, some of it even can move.The biggest difference between partition and wall is that a partition is made under the plate, that is to say, the height of the facade is different.

2. The operate method of scalability fully embody the people-oriented concept, flexible tactile touch, spring operation became more safe and durable.

 

3. Overhead type track, you just need to install the orbit on the floor or on the rack, there is no track on the floor, have no damage on the ground.

4. Unique aluminium materials ,which can be used for painting.

5.  It is convenient to collect,plate can be hide in special coffer, have no effect to the whole appearance.

6.  It is widely used for many occasions.

Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended 0

 

The Installing Procedure of Movable Partition Walls

 

1. Please designate the responsible person before construction and leave contact information to facilitate communication between the two parties on construction logistics.

 

2. If the ground has been finished before the track construction, if the carpet, floor tiles, floor, etc. have been laid, you need to do ground protection to prevent the welding sparks from damaging the ground.

 

3. You need to provide the height of the shed after the decoration is completed. We will determine the height of the track installation according to this height.

 

4. Because we need to calculate the size of the hanging track, you need to provide the net size of the finished wall and the pillar. We will hang the track according to this size.

 

5. After the track suspension is completed, the reserved wall size given by you cannot be changed. Because we calculate the construction according to this size, if the size is changed, the door panel will not operate.

 

6. After the track suspension is completed, our construction personnel will fill in the dimensional confirmation letter to provide accurate data for the production of the wallboard. You need to specify the person in charge of the site to confirm.

 

7. The movable partition walls should be horizontally perpendicular to the ground directly below the track, and the error should not exceed 1cm.

 

8. If there are other constructions at the same time, please do not pierce the foreign objects such as nails and insert them on the installed rails. This will cause the door pulleys to not run in the track.

 

9. Each group of tracks will have a “raw mouth”, which will be removed before installing the door panel, and then installed after the door panel is installed. This "raw mouth" cannot be sealed.

 

10. In order to facilitate future maintenance and maintenance, please reserve the inspection port near the ceiling track to facilitate the maintenance personnel to enter the inspection port for product maintenance and maintenance.

 

11. If you need to improve the sound insulation effect of the product, after the track is hung, you can make sound insulation between the track and the original shed.

 

12. After the door panel is hung, it needs to be debugged. Active partition reminder Do not use the door panel before our personnel have debugged the door panel, otherwise forcible use will result in damage to the door panel.

Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended 1

 

Technical Details of Movable Partition Walls:

 

Series BG65 BG80 / BG85 BG100 & BG125
Panel suspension Top hung only Top hung only Top hung only
Track system Single or twin point Single or twin point Single or twin point
Panel thickness 65mm 80mm / 85mm 100mm
Panel height Up to 4000mm Up to 6000mm Up to 18000mm
Max height 4000mm 6000mm 18000mm
Panel width 600-1230mm 600-1230mm 600-1230mm
Frame construction Aluminum frame Aluminum frame Aluminum frame
Face material 9mm 9mm / 12mm 12mm
Fire safety Optional Class I or O Optional Class I or O Optional Class I or O
Vertical profiles Aluminum anodised with sealing profiles Aluminum anodised with sealing profiles Aluminum anodised with sealing profiles
Retractable seals Aluminum black with
double rubber seals
Aluminum black with double rubber seals Aluminum black with double rubber seals
Operation of seals Manual, with supplied
operating handle
Manual, with supplied operating handle Manual, with supplied operating handle
Locking Optional lock to pass doors Optional lock to pass doors Optional lock to pass doors
Pass doors Single open in panel or
double open in two panel
Single open in panel or double open in two panel Single open in panel or double open in two panel
Sound insulation 32-38dB Rw 36-45dB Rw 42-55dB Rw
Weight Approx 22-35kg/sq M Approx 25-40kg/sq M Approx30-48kg/sq M

Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended 2

Construction Method of Movable Partition Walls


1.Track installation:Suspension fixed way is at the top of the movable partition walls board install the hanging wheel, and connected to the track suspension. The track and hanging wheel should be chosen according to the partition size and load weight.

2.Movable partition walls panel installation: according to the design drawing, draw on each partition panel to mark the line wheel, fix the wheel with screws on the partition board top; Then the panel be put into track, let each panel in the perpendicular to the ground; Test and push-pull flexible rotation, and finally to fixed connection.

3.Debugging: Movable partition walls need to discretion, sealing and so on debugging after installed. Then cleaning up the panel, complete the installation work

Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended 3

Want to Know more details about this product
I am interested in Modern Flexible Movable Sliding Office Partition Walls Top Ceiling Suspended could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.